Have ideas or plans you would like to discuss?
Recent Articles
Building Reopening – ASHRAE HVAC Guidelines
ASHRAE has published Building Readiness Information that provides practical information and checklists for how your building should be operating and how to practically check its HVAC operation. ASHRAE documents include guidance for implementing measures to limit the spread of
Greg Engel Presents at I2SL ColLABorate 2019
Greg Engel Presents and I2SL ColLABorate 2019 The
Breaking barriers and walls at Gigi’s Playhouse!
The folks at Gigi’s begin work at a new, bigger facility in Tinley Park Gigi’s is a national non-profit network that is changing the way the world views Down syndrome. The new facility will allow Gigi’s Tinley Park to
A Climate for Success at Engel Labs
A “Critical Environment” challenge at the University of Chicago Background When Dr. Gregory Engel moved his research lab from the University of California at Berkeley to the University of Chicago, it was with the promise that he could design
Simon Laser Lab
Asst. Professor Simon Laser Laboratory University of Chicago - GCIS Building IBS provided full mechanical Design Build services for the temperature controls and environmental conditions of the new laser laboratory space. This included providing an initial vetting of the
Tokmakoff Laser Lab
Professor Tokmakoff Laser Laboratory University of Chicago - GCIS Building IBS provided full mechanical Design Build services for the temperature controls and environmental conditions of the new laser laboratory space. This included providing an initial vetting of the proposed